STP218 Data Validation Report

 

Scientific plan

Planned L0 data products of STP218: 316 VL, 0 UV, 79 LC, 0 VL CR/SEP mat, 0 UV CR/SEP mat, 0 VL TEMP mat, 0 UV TEMP mat

Planned L2 data products of STP218: 632 VL-L2, 0 UV-L2

STP218
 Download detailed report
Start Stop Observing program Description Solar Orbiter Observing Plan (SOOP) VL/bin
DIT/NDIT/CAD
UV/bin
DIT/NDIT2/CAD
22/08/2022 03:29:00 22/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
22/08/2022 23:29:00 23/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
23/08/2022 00:29:00 23/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
23/08/2022 23:29:00 24/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
24/08/2022 00:29:00 24/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
24/08/2022 23:29:00 25/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
25/08/2022 00:29:00 25/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
25/08/2022 23:29:00 26/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
26/08/2022 00:29:00 26/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
26/08/2022 23:29:00 27/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
27/08/2022 00:29:00 27/08/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
27/08/2022 23:29:00 28/08/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
28/08/2022 00:29:00 28/08/2022 15:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/7200s
28/08/2022 16:00:00 28/08/2022 16:22:01 LOW LATENCY Quick look data pB/4x4
30s/10/1220s

LEGEND • VL: Visible Light image • UV: Ultraviolet image • DIT: Detector Integration Time, i.e., the time interval during which the detector pixels are collecting photons. It represents the actual exposure of a single read out of the detector (frame) • NDIT: Number of detector integrations, i.e., the number of VL frames with the same polarisation to be averaged pixel by pixel in order to obtain the final image • NDIT2: Number of UV images to be averaged pixel by pixel via software in order to obtain the final image • CAD: Cadence time between two consecutive exposures • tB: Total brightness VL image • pB: Polarised brightness VL image • FP: VL images taken with fixed polarisation

 

1 TM/TC analysis

TBD (no report found)

 

2 Data products

2.1 Missing L0 data products

Total number of L0 files: 395
- unique: 395
- duplicates: 0

- duplicates of OBJ_CNT: 0

No missing L0 data

2.2 Comparison of L0 and L1 data products

Total number of L1 files: 395
- unique: 395
- duplicates: 0

- duplicates of OBJ_CNT: 0

Number of L1 files is consistent with that of L0 files

2.3 Comparison of L1 and L2 data products

Total number of L2 files: 632
- unique: 632
- duplicates: 0

- duplicates of OBJ_CNT: 0

Number of L2 files is as expected considering available L1 files

 

3 Corrupted images

TBD

 

4 SSC jumps

TBD (no report found)

 

5 Other anomalies

TBD

 

6 Data volume

TBD (no report found)

Planned total data volume is 187.46 MiB

 

7 Door status

TBD

 

8 Pointing

TBD

 

9 Stars

TBD

 

10 Planets

TBD

 

11 Comets

TBD

 

12 Debris

TBD

 

13 CMEs

TBD

 

14 SEPs

TBD

 

Appendix

STP218 Planning Spreadsheet - As run

Metis Data Validation and Verification - MOF version

SY-CRP-000