STP232 Data Validation Report

 

Scientific plan

Planned L0 data products of STP232: 572 VL, 0 UV, 143 LC, 0 VL CR/SEP mat, 0 UV CR/SEP mat, 0 VL TEMP mat, 0 UV TEMP mat

Planned L2 data products of STP232: 1144 VL-L2, 0 UV-L2

STP232
 Download detailed report
Start Stop Observing program Description Solar Orbiter Observing Plan (SOOP) VL/bin
DIT/NDIT/CAD
UV/bin
DIT/NDIT2/CAD
21/11/2022 06:29:00 21/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
21/11/2022 23:29:00 22/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
22/11/2022 00:29:00 22/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
22/11/2022 23:29:00 23/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
23/11/2022 00:29:00 23/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
23/11/2022 23:29:00 24/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
24/11/2022 00:29:00 24/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
24/11/2022 23:29:00 25/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
25/11/2022 00:29:00 25/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
25/11/2022 23:29:00 26/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
26/11/2022 00:29:00 26/11/2022 22:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
26/11/2022 23:29:00 27/11/2022 00:00:00 LOW LATENCY Quick look data pB/4x4
30s/10/1220s
27/11/2022 00:29:00 27/11/2022 19:59:16 METIS_GENERIC Global corona configuration measurements pB/2x2
30s/14/3600s
27/11/2022 20:29:00 27/11/2022 20:51:01 LOW LATENCY Quick look data pB/4x4
30s/10/1220s

LEGEND • VL: Visible Light image • UV: Ultraviolet image • DIT: Detector Integration Time, i.e., the time interval during which the detector pixels are collecting photons. It represents the actual exposure of a single read out of the detector (frame) • NDIT: Number of detector integrations, i.e., the number of VL frames with the same polarisation to be averaged pixel by pixel in order to obtain the final image • NDIT2: Number of UV images to be averaged pixel by pixel via software in order to obtain the final image • CAD: Cadence time between two consecutive exposures • tB: Total brightness VL image • pB: Polarised brightness VL image • FP: VL images taken with fixed polarisation

 

1 TM/TC analysis

TBD (no report found)

 

2 Data products

2.1 Missing L0 data products

Total number of L0 files: 715
- unique: 715
- duplicates: 0

- duplicates of OBJ_CNT: 0

Missing OBJ_CNT metadata for the following L0 files:
- solo_L0_metis-light-curve_0722363252_V01.fits

2.2 Comparison of L0 and L1 data products

Total number of L1 files: 715
- unique: 715
- duplicates: 0

- duplicates of OBJ_CNT: 0

Number of L1 files is consistent with that of L0 files

2.3 Comparison of L1 and L2 data products

Total number of L2 files: 1144
- unique: 1144
- duplicates: 0

- duplicates of OBJ_CNT: 0

Number of L2 files is as expected considering available L1 files

 

3 Corrupted images

TBD

 

4 SSC jumps

TBD (no report found)

 

5 Other anomalies

TBD

 

6 Data volume

TBD (no report found)

Planned total data volume is 349.39 MiB

 

7 Door status

TBD

 

8 Pointing

TBD

 

9 Stars

TBD

 

10 Planets

TBD

 

11 Comets

TBD

 

12 Debris

TBD

 

13 CMEs

TBD

 

14 SEPs

TBD

 

Appendix

STP232 Planning Spreadsheet - As run

Metis Data Validation and Verification - MOF version

SY-CRP-000